Complete the cage work (tying into the frame, fully welding some of the unfinished joints)
Drop the engine, trans and tranfer case in place ( I have all the parts and pieces, just no room for the hoist, minor fab work needed)
Also, I will be installing a Deaver pack in the rear, so that needs to have shackles done and shock mounts fabbed in the rear, front suspension and steering is done.
Thats about all I need for help. If any of you fabbers have some extra time, PM me for details. I can trade for electrical work if interested
